Baglihar Hydroelectric Project

  • Dam filling, mucking and lifting of Boulder Stone
  • Cutting and lifting of mucking

Chenani Nashri Tunnel Project

  • Portal excavation
  • Shotcrete
  • Road work
  • Gabion work
  • Transportation of muck

PMGSY Road Projects in Jammu

  • Slope Protection (Breast wall)
  • Earthwork excavation

Skyview Gondola Project in Patnitop District Udhampur

  • Slope Protection (Breast wall)
  • Earthwork excavation
  • Slide removal works

Udhampur to Ramban section of NH-1A (Now NH-44) Road Project

  • Slope Protection (Breast wall)
  • Earthwork excavation
  • Slide removal works

Construction of Toilets, Lakes, Huts & Cafeteria at Patnitop & Bhaderwah

  • Construction of Toilets
  • Construction of Sanasar Lake by way of fountain and allied works.
  • Construction of cafeteria at Bhaderwah

Construction Of Police Department Building In Udhampur

Construction of Crash Barriers on Various Roads under the PMGSY Division, Udhampur (Length: 6,575 Metres)

Construction Of Tourism Hut And Beautification Of Patnitop Includes The Washroom And Patnitop And The Diesel Stone Path In Sanasar

Construction of Pucca path at Tringle Village Batote

  • Construction of Pucca path along with provisioning of solar street lights at Ward No. 2 Village Tringle Batote.

Temporary restoration of roads including earth work, dressing and surface restoration.

  • Batote to Rakh Jarog (Pkg. JK04-197)
  • Batote to Chakwa (Pkg. JK04-274)
  • Champa to Dhaino (Pkg. JK04-279)

Temporary restoration & repairs to PMGSY roads.

  • Dhalwas Savni Karma (Pkg. JK19-3007)
  • Dhalwas Savni Karma (Pkg. JK04-273)
  • Dhaino to Papriya (Pkg, JK04-465)

Semi-pucca walling, crated walling. HP Culverts & surface filling in sinking stretch.

( Pkg. JK19-3006 )

Hume pipe culvert, crated walling. back cutting & stabilization of sinking stretch.

(Pkg, JK04-107)

Road safety works including crash barriers, sign boards, edge walls & parapets.

Lane, drain, protection wall, tile work, sitting benches, water bowli, iron grating & allied works.

Foundation & revetment works for 400kV DVC TL.

Benching works in soil, fissured rock & hard rock.

Landslide protection works for 132kV line - 102 towers.

Civil construction works at Substation.

Larsen & Toubro (L&T) secured a contract from Power Grid Corporation of India Limited (PGCIL)

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.

Rs Infra Project Pvt LTD Construction Of 132 Kv Transmission LINE From Ramban To Khellani To Doda

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.

Transrail foundation & Revetment work at our G519: 400 kV double-circuit transmission line from Pot Head Yard of KIRU-KISHTWAR

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.

Larsen & Toubro (L&T) secured a contract from Power Grid Corporation of India Limited (PGCIL)

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.
  • Bolt tightening and tower alignment.
  • Tower earthing and earth electrode installation.
  • Installation of tower accessories, danger plates, phase plates and number plates.
  • Conductor stringing using suitable stringing equipment and methods.

Rs Infra Project Pvt LTD Construction Of 132 Kv Transmission LINE From Ramban To Khellani To Doda

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.
  • Bolt tightening and tower alignment.
  • Tower earthing and earth electrode installation.
  • Installation of tower accessories, danger plates, phase plates and number plates.
  • Conductor stringing using suitable stringing equipment and methods.

Construction Of Police Department Building In Udhampur

Transrail foundation & revitment work at our G519: 400kV D/c TL from Pot Head Yard of KIRU-KISHTWAR

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.
  • Bolt tightening and tower alignment.
  • Tower earthing and earth electrode installation.
  • Installation of tower accessories, danger plates, phase plates and number plates.
  • Conductor stringing using suitable stringing equipment and methods.

Larsen & Toubro (L&T) secured a contract from Power Grid Corporation of India Limited (PGCIL) for the Tower Package (TW01) to string the second circuit of the 400kV double-circuit Kishenpur-Dulhasti transmission line

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.
  • Bolt tightening and tower alignment.
  • Tower earthing and earth electrode installation.
  • Installation of tower accessories, danger plates, phase plates and number plates.
  • Conductor stringing using suitable stringing equipment and methods.
  • Installation of earth wire/OPGW stringing, where applicable.
  • Installation of insulator strings, hardware fittings and conductor accessories.
  • Conductor sagging, tensioning and final sag adjustment as per approved parameters.
  • Installation of spacers, vibration dampers and other line accessories.
  • Jumper connections and dead-end/ tension tower works.
  • Final inspection, rectification and line clearance.
  • Foundation/tower protection works wherever required.
  • Site restoration and removal of temporary arrangements.
  • Testing, commissioning support and handing over of the completed line.

Rs Infra Project Pvt LTD Construction Of 132 Kv Transmission LINE From Ramban To Khellani To Doda

  • Site survey, marking and tower location setting-out.
  • Site clearing, access track and working-area preparation.
  • Excavation for tower foundations.
  • PCC, reinforcement, shuttering and RCC foundation work.
  • Stub setting, alignment and levelling.
  • Backfilling and proper compaction of foundations.
  • Tower material assembly and tower erection.
  • Bolt tightening and tower alignment.
  • Tower earthing and earth electrode installation.
  • Installation of tower accessories, danger plates, phase plates and number plates.
  • Conductor stringing using suitable stringing equipment and methods.
  • Installation of earth wire/OPGW stringing, where applicable.
  • Installation of insulator strings, hardware fittings and conductor accessories.
  • Conductor sagging, tensioning and final sag adjustment as per approved parameters.
  • Installation of spacers, vibration dampers and other line accessories.
  • Jumper connections and dead-end/ tension tower works.
  • Final inspection, rectification and line clearance.
  • Foundation/tower protection works wherever required.
  • Site restoration and removal of temporary arrangements.
  • Testing, commissioning support and handing over of the completed line.

1, 2, 4, 5, 6    Batote, Ramban, J&K7

3                  Gandhri, Ramban, J&K

7                  Kiru - Kishtwar, J&K

8, 9              Khellani - Kishtwar, J&K

10                Chumathang, Leh, Ladakh

Sl. No.Name Of WorkClient / DepartmentLocationKey DetailsStatus
01Temporary Restoration Work Of

  • Batote to Rakh Jarog (Pkg. JK04-197)

  • Batote to Chakwa (Pkg. JK04-274)

  • Champa to Dhaino (Pkg. JK04-279)


Total Length :- 27.15 Kms
PMGSYBatote,
Ramban,
J&K
Temporary restoration of roads
including earth work, dressing
and surface restoration.
ONGOING
02Temporary Restoration Work Of

  • Dhalwas Savni Karma (Pkg. JK19-3007)

  • Dhalwas Savni Karma (Pkg. JK04-273)

  • Dhaino to Papriya (Pkg, JK04-465)


Total Length :- 19.20 Kms
PMGSYBatote,
Ramban,
J&K
Temporary restoration & repairs
to PMGSY roads.
ONGOING
03Permanent Restoration of
Khunga to Kothi Jagir Road

(Pkg. JK19-3006)
Length :- 16.80 Kms
PMGSY-III
(SASCI)
Gandhri,
Ramban,
J&K
Semi pucca walling, crated walling.
HP Culverts & surface filling in
sinking stretch.
ONGOING
04Permanent Restoration of
Dhalwas to Savni Karma Road
(Pkg, JK04-107)
Length :- 7.00 Kms
PMGSYBatote,
Ramban,
J&K
Hume Pipe Culvert, crated walling.
back cutting & stabilization of
sinking stretch.
ONGOING
05Providing and Erecting of "W" Metal Beam
Crash Barrier, Cautionary Board, Retro
Reflective Sign Boards, Edge Wall &
Parapets on 5 Road Packages
PMGSYRamban
District,
J&K
Road safety works including crash
barriers, sign boards, edge walls
& parapets.
ONGOING
06Constt./repair of Lane, drain Iron grating
and other allied works in all Wards at
MC Batote (26 Locations)
Municipal Committee
Batote (USD Sector
Capex 2026-27)
Batote,
Ramban,
J&K
Lane, drain, protection wall, tile work,
sitting benches, water bowli, iron
grating & allied works.
ONGOING
07Company TRANSRAIL foundation &
Revirement work at our G519: 400kV
D/c TL from Pot Head Yard of
KIRU-KISHTWAR Pooling Station
TRANSRAILKiru - Kishtwar,
J&K
Foundation & revetment works for
400kV DVC TL.
ONGOING
08RS INFRA Benching Work for all types of
Soil, Fissured Rock, Hard Rock
132kV Khellani - Kishtwar
RS INFRAKhellani -
Kishtwar,
J&K
Benching works in soil, fissured
rock & hard rock.
ONGOING
09RS INFRA protection work of 102 tower,
protecting the landslide
132kV Khellani - Kishtwar Line
RS INFRAKhellani -
Kishtwar,
J&K
Landslide protection works for
132kV line - 102 towers.
ONGOING
10GEPDEC INFRATECH LIMITED
Civil works at Chumathang Substation,
Leh, Ladakh
PGCIL - Ladakh RDSS PKG 1
GEPDEC
INFRATECH
LIMITED
Chumathang,
Leh, Ladakh
Civil construction works at
Substation.
ONGOING

Road Restoration Works Batote, Ramban

Permanent Restoration Works Ramban

Crash Barrier & Safety Works Ramban District

Lane & Drain Works Mc Batote

Transmission LINE Works Kishtwar

Substation Civil Works Leh, Ladakh